{"product_id":"space-shuttle-main-engine-nasa-has-not-evaluated-the-alternate-fuel-turbopump-costs-and-benefits-nsiad-94-54-paperback","title":"Space Shuttle Main Engine: NASA Has Not Evaluated the Alternate Fuel Turbopump Costs and Benefits: Nsiad-94-54 - Paperback","description":"\u003cdiv\u003e\u003cp style=\"text-align: right;\"\u003e\u003ca href=\"https:\/\/reportcopyrightinfringement.com\/\" target=\"_blank\" rel=\"nofollow\"\u003e\u003cb\u003eReport copyright infringement\u003c\/b\u003e\u003c\/a\u003e\u003c\/p\u003e\u003c\/div\u003e\u003cp\u003eby \u003cb\u003eU. S. Government Accountability Office (\u003c\/b\u003e (Created by)\u003c\/p\u003e\u003cp\u003eGAO reviewed the National Aeronautics and Space Administration's (NASA) planned development of an alternate high pressure fuel turbopump for the Space Shuttle's main engines, focusing on whether NASA has adequately analyzed cost, performance, and expected program benefits in comparison to other alternatives before resuming its development of the alternate pump. \u003cbr\u003e \u003cbr\u003e GAO found that: (1) the current engine pump is safe and reliable if existing safety controls are effectively implemented; (2) NASA supports continued development of the alternate pump because of safety concerns about some aspects of the current pump's design; (3) NASA has not analyzed the costs and benefits of modifying the existing fuel pump because a major upgrade will require an expensive full certification test; (4) NASA has not determined what contribution the alternative fuel pump will make to the Shuttle's reliability in conjunction with other engine safety improvements; (5) the alternate fuel pump will require extensive testing and possible redesign as problems occur; (6) NASA did not analyze the costs and benefits of modifying the existing fuel pump and other alternatives before resuming development of the alternate pump; and (7) NASA expects that the alternate pump will reduce operating costs by decreasing inspections and maintenance, but it has not estimated the expected savings.\u003c\/p\u003e\n            \u003cdiv\u003e\n\u003cstrong\u003eNumber of Pages:\u003c\/strong\u003e 24\u003c\/div\u003e\n            \u003cdiv\u003e\n\u003cstrong\u003eDimensions:\u003c\/strong\u003e 0.05 x 9.69 x 7.44 IN\u003c\/div\u003e\n            \u003cdiv\u003e\n\u003cstrong\u003ePublication Date:\u003c\/strong\u003e August 07, 2013\u003c\/div\u003e\n            ","brand":"BooksCloud","offers":[{"title":"Default Title","offer_id":45862931202245,"sku":"9781287294443","price":15.93,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0757\/6718\/5605\/files\/D-bkRKczdp9781287294443.webp?v=1771575654","url":"https:\/\/selloorium.com\/products\/space-shuttle-main-engine-nasa-has-not-evaluated-the-alternate-fuel-turbopump-costs-and-benefits-nsiad-94-54-paperback","provider":"Selloorium","version":"1.0","type":"link"}